High-rise reinforced concrete structure under construction at dusk
N 19°04' · E 72°52'EL. +00.000 · Datum MSL

MD. TAUSIF
KHAN

High-Rise Civil Construction — L&T Construction Ltd.

Nineteen-plus years delivering high-rise RCC structures, tower execution and precision survey control, backed by civil, infrastructure and Oil & Gas experience across India and the GCC.

  • · High-Rise RCC Construction
  • · Survey & Setting Out
  • · Oil & Gas Civil Works
  • · Excavation, Piling & Shoring
  • · Underground Utilities
19+
Years
04
Countries
06
Companies
High-Rise
Core Focus
01 / Profile

Built on site, not on paper.

Civil engineering professional with more than nineteen years of hands-on execution experience, led by high-rise RCC and tower construction across L&T and Unity Infra projects, with additional Oil & Gas and power-plant exposure in India and the GCC.

Specialised in sulphur storage buildings, high-rise structures, pipe racks, long-distance pipelines up to 48", townships and villas, fire water lines, communication buildings, substations, earthwork, sewerage lines, water tanks, oil tanks, large drainage networks and underground facilities.

Experienced in leading multidisciplinary site teams, engineering coordination with clients and consultants, drawing review and redline preparation, QA/QC compliance, quantity estimation, BBS review and complete project handover documentation.

Qualification

Diploma in Civil Engineering (Part Time), Imperial India — 2002–2006

Certificate attested by Govt. of India & Qatar.

Software

  • — MS Office (Word, Excel, PP)
  • — AutoCAD
  • — Photoshop
  • — All Windows OS

Codes & Standards

SAES-A-100SAES-A-113SAES-A-114SAES-A-801SAES-O-119
Portrait of Md. Tausif Khan

MD. TAUSIF KHAN

Assistant Manager — Civil Construction

  • LanguagesEnglish, Hindi, Urdu & Arabic
  • LicenceHolds KSA & Indian Driving Licence
  • BaseMumbai, India

Training & Certification

  • — AutoCAD
  • — Good knowledge of survey work & survey instruments
  • — Excavation billing knowledge
  • — Extensive knowledge of OSHA
  • — Medical First Responder (MFR)
  • — Collapsed Structure Search & Rescue (CSSR)
  • — Quantity surveying (civil) & BBS
  • — KSA Driving Licence
0+

Years of Experience

0

Companies

0

Countries Worked

0

Core Expertise Areas

02 / Expertise

Technical capability.

Disciplines carried across high-rise buildings, industrial plants and underground infrastructure.

01

Civil Construction

End-to-end execution of civil works to drawings, codes and schedules.

02

RCC & Structural Works

Reinforcement, shuttering, concreting and post-concrete quality checks.

03

Survey & Setting Out

Layout verification, levels, alignments and as-built documentation.

04

AutoCAD

Drawing review, coordination, redline and as-built drawings.

05

Total Station

Precision setting out and monitoring of structures and excavations.

06

Auto Level & GPS

Level control, formation levels and site-wide coordinate control.

07

Excavation & Earthwork

Bulk excavation, rock excavation, backfilling and compaction control.

08

Piling & Anchoring

Rotary bored piles, micro piles, rock anchors and soil nails.

09

Underground Utilities

Fire water, potable water, storm water, sewerage and drainage networks.

10

Oil & Gas Civil

Pipe racks, equipment foundations, storage tanks and pipelines up to 48".

11

QA/QC

Material inspection, cube and slump tests, NCR closure and dossiers.

12

BBS & Quantity Surveying

Bar bending schedules, BOQ review, estimation and billing measurement.

13

Engineering Coordination

Clients, consultants, subcontractors and internal project teams.

14

Project Planning

Look-ahead schedules, progress reports and management presentations.

15

Team Management

Manpower deployment, performance monitoring and mentoring.

16

Safety & OSHA

Risk assessment, work permits, MFR and CSSR trained.

03 / Career Journey

From high-rise execution to site leadership.

Tower construction at L&T and Unity Infra leads a career spanning RCC, survey, excavation, infrastructure and industrial civil works across four countries.

Larsen & Toubro Construction Ltd. — CCS 6 & 7 High-rise Buildings & Infrastructure Works
CCS 6&7, Delhi, IndiaNov 2022 — Present

Nov 2022 — Present

Larsen & Toubro Construction Ltd.

Assistant Manager — Tower Incharge (High-rise Superintendent, B&F)

Location
CCS 6&7, Delhi, India
Client
CPWD
Project
CCS 6 & 7 High-rise Buildings & Infrastructure Works
Duration
Nov 2022 — Present
  • Manages end-to-end execution of civil and infrastructure works against approved drawings, specifications, schedules and quality standards.
  • Leads engineering coordination with consultants, architects, clients and subcontractors; reviews shop drawings, method statements and RFIs.
  • Supervises RCC, structural, finishing, excavation, underground utility and infrastructure activities including pipe rack, equipment and sump/lift pit foundations.
  • Coordinates QA/QC inspections, material approvals, testing, NCR closure and handover documentation.
  • Reviews BOQs, quantity estimations, BBS, material reconciliation, billing quantities and cost control reports.
  • Leads multidisciplinary teams with technical guidance, resource planning and mentoring of junior engineers.
RCC & StructuralHigh-rise B&FUnderground UtilitiesPlanning & BillingQA/QCAutoCAD
SNB Infrastructure Pvt. Ltd. — High-rise Foundations, Basements & Deep Excavation Support
Mumbai, India2021 — 2022

2021 — 2022

SNB Infrastructure Pvt. Ltd.

Site Incharge — Excavation, Piling & Structural Support

Location
Mumbai, India
Client
Various clients
Project
High-rise Foundations, Basements & Deep Excavation Support
Duration
2021 — 2022
  • Planned and supervised bulk excavation for high-rise foundations and basements in soil, hard rock and mixed strata.
  • Supervised rotary bored piles and micro piles — setting out, drilling, bore stability, cage installation, tremie concreting and integrity checks.
  • Managed rock anchors, passive anchors, soil nails, waler beams, capping beams and soldier pile shoring systems for deep excavation.
  • Coordinated with structural engineers, geotechnical consultants and piling subcontractors on sequencing and stability.
  • Used Total Station, Auto Level and GPS for layout verification, monitoring and as-built documentation.
Deep ExcavationRotary & Micro PilingRock AnchorsShoring SystemsTotal Station / GPS
M. R. Al Khathlan Co. — Sulphur Storage Building, Pump Station, Tanks & Fire Water Lines
Riyadh & Jubail, Saudi ArabiaSept 2016 — Oct 2018

Sept 2016 — Oct 2018

M. R. Al Khathlan Co.

Sr. Civil Engineer — Oil & Gas

Location
Riyadh & Jubail, Saudi Arabia
Client
Saudi Aramco
Project
Sulphur Storage Building, Pump Station, Tanks & Fire Water Lines
Duration
Sept 2016 — Oct 2018
  • Site incharge for sulphur storage building and drainage system works under Saudi Aramco standards.
  • Executed pipe rack foundation construction and repair, precast pipeline support foundations and all foundation works.
  • Monitored excavation for fire water lines and pipelines along with soil compaction and large drainage works.
  • Reviewed GFC and IFC drawings, prepared redline drawings and coordinates for the required work sequence.
  • Controlled concrete quality through cube and slump testing, 7-day and 28-day strength checks and RCC defect inspection.
  • Completed pump station, tanks and fire water line works with full material inspection and work permit compliance.
Saudi Aramco StandardsSulphur StoragePipe Rack FoundationsFire Water LinesSAES Codes
Samsung C&T — Umm Al Houl Power Plant — Water Tanks & GIS Buildings
Umm Al Houl, Al Wakra, QatarApril 2015 — July 2015

April 2015 — July 2015

Samsung C&T

Civil Survey Engineer — Power Plant

Location
Umm Al Houl, Al Wakra, Qatar
Client
Doha Govt.
Project
Umm Al Houl Power Plant — Water Tanks & GIS Buildings
Duration
April 2015 — July 2015
  • Executed potable water tanks 1–4 of 64 m radius and related structures.
  • Worked on GIS 400 KV, 220 KV and 132 KV buildings.
  • Handled drainage and fire water line works with underground utility checks before excavation.
  • Prepared material take-off requirements and isometric drawings for construction.
  • Controlled earthwork and soil compaction testing at max 200 mm layers as per drawings.
  • Applied BBS, concrete and shuttering quantity knowledge; produced mechanical completion certificates (MCC).
Power Plant CivilWater TanksGIS BuildingsBBS & QuantitiesSurvey Setting Out
Combined Group (Shutdown Project) — Crude Oil Storage Tanks, Substations & Bulk Handling Facilities
Burgan, KuwaitApril 2014 — Sept 2014

April 2014 — Sept 2014

Combined Group (Shutdown Project)

Survey Incharge — Oil & Gas

Location
Burgan, Kuwait
Client
KOC & KNPC
Project
Crude Oil Storage Tanks, Substations & Bulk Handling Facilities
Duration
April 2014 — Sept 2014
  • Handled survey for crude oil storage tanks, substations, control buildings and pipe rack foundations.
  • Supported bulk handling facilities for production chemicals in south-east and north Kuwait.
  • Prepared material take-off requirements and isometric drawings; handled related AutoCAD work.
  • Led civil activities and site teams for safe, timely and quality execution under work permit control.
  • Monitored concrete strength testing and inspected defects such as porosity, cracks and excess penetration.
  • Completed oil tanks and substations along with drainage and asphalt works.
Shutdown WorksOil Storage TanksSubstationsPipelinesAutoCAD Survey
Unity Infra Projects Ltd. — Market City Mall Kurla, JVLR Road Bridges & Vaitarna Water Tunnel
Maharashtra, India2007 — 2013

2007 — 2013

Unity Infra Projects Ltd.

Site Engineer — Various Projects

Location
Maharashtra, India
Client
Various clients
Project
Market City Mall Kurla, JVLR Road Bridges & Vaitarna Water Tunnel
Duration
2007 — 2013
  • Commercial project with three parking basements at Market City Mall, Kurla — plot area 1,00,000 sq.m.
  • Setting out of precast beams, columns and foundations with orientation and verticality checks.
  • Road bridge works on the JVLR corridor from Jogeshwari to Vikhroli.
  • High-rise building works including Rubimill Compound and India Bulls Business Park.
  • Tunnel works at Khardi and Kasara from Vaitarna Dam for Mumbai water distribution, in joint venture with an Austria-based company.
  • Client interface for contractual and code compliance plus concrete strength verification at 7 and 28 days.
High-rise BuildingsRoad BridgesTunnelsPrecast WorksWater Infrastructure
04 / Projects

High-rise first. Project by project.

Starting with tower and RCC work at L&T and Unity Infra, then expanding into deep excavation, oil & gas, survey and infrastructure across India and the GCC.

Common Central Secretariat (CCS) 6 & 7, New Delhi, India
2022 — Present

Common Central Secretariat (CCS) 6 & 7

CompanyLarsen & Toubro Limited

LocationNew Delhi, India

RoleAssistant Manager — Civil / Survey & Construction Coordination

Large-scale government infrastructure — RCC & structural execution with full survey control

Explore Project
The Prestige City, Indirapuram (TPCI), Indirapuram, Ghaziabad, India
2022 — Present

The Prestige City, Indirapuram (TPCI)

CompanyLarsen & Toubro Limited

LocationIndirapuram, Ghaziabad, India

RoleAssistant Manager — Civil

6 EWS residential buildings — RCC construction, survey and setting out

Explore Project
Oberoi Forestville — Kolshet, Thane, Kolshet, Thane, India
2022 — Present

Oberoi Forestville — Kolshet, Thane

CompanyLarsen & Toubro Limited

LocationKolshet, Thane, India

RoleAssistant Manager — Civil

Buildings A, B & C — RCC structure up to 10th floor / conventional slab

Explore Project
Cleaveland Site & Market City, Kurla, Mumbai, India
2007 — 2013

Cleaveland Site & Market City, Kurla

CompanyUnity Infra Projects Ltd.

LocationMumbai, India

RoleSite Engineer

Commercial building works with three parking basements; precast setting out

Explore Project
LTR Gate No. 1 — Powai, Powai, Mumbai, India
2007 — 2013

LTR Gate No. 1 — Powai

CompanyUnity Infra Projects Ltd.

LocationPowai, Mumbai, India

RoleSite Engineer

High-rise building construction and civil site execution

Explore Project
05 / Global Experience

Four countries. One discipline.

Project execution across India and the GCC — India, Saudi Arabia, Qatar and Kuwait.

INDKSAQATKWT
Career deployment map — hover a marker
India project work
IND

India

L&T Construction / SNB Infrastructure / Unity Infra Projects

Delhi high-rise complex, Mumbai deep excavation & piling, JVLR bridges, Vaitarna water tunnel.

06 / Contact

LET'S BUILD
WHAT'S NEXT

LinkedIn

Iqbaltausif

Location

Mumbai, India

Download CVSend EmailSkype · Khantausif4646